- Home
- Departments
- Public Works
- Stormwater Division
- Stormwater Permitting
Stormwater Permitting
The Stormwater Division and its regulations were created to protect, maintain, and enhance public health, safety, welfare, and the environment by establishing procedures to control the adverse effects of active development and post development stormwater pollution. In order to mitigate this pollution, we have a permitting system that allows us to work with you before and during your project to make sure that our town remains protected after the project is completed. This page provides you with any pertinent information you need to successfully apply for a permit including...
- How to determine what type of permit you need
- How to apply for permits
- The fee schedule for all permits
Please be advised, all permits need to be completed online via Permiteyes. If you have any questions, please email us at stormwater@braintreema.gov , call us at 781-794-8930, or come into our office at 85 Quincy Ave. where we will gladly help you through the process.
How To Determine What Type of Permit You Need
Online Stormwater Permitting
All Stormwater Permits MUST be submitted online via our permitting website, PermitEyes. This portal allows you to track every step of the permitting process including approvals, upcoming steps, and fees. You can scan all pertinent documents and information to the website, as well as submit payments. Should you have any issues or questions, please reach out at 781-794-8930.
Required Permit Submissions
- Copies of any approvals received from the Conservation Commission or Planning Board
- Project Narrative describing existing conditions, proposed development and methods used to mitigate stormwater impacts as well as an evaluation and implementation of Low Impact Development Best Management Practices
- Stormwater Management Plan in accordance with Appendix B of the Stormwater Regulations that includes:
- Existing Conditions Plan with property line information, existing topography (2 foot contour interval), existing utilities, drainage, tree line, wetland boundaries, stamped and signed by a MA registered Professional Land Surveyor
- Site Plan with site layout, proposed grading (2 foot contour interval) proposed utilities, proposed clearing, stormwater management measures, soil testing data and limit of work line, signed and stamped by a MA registered Professional Engineer
- Stormwater Report that includes:
- Completed Mass DEP Stormwater Checklist signed and stamped by a MA registered Professional Engineer
- Pre and Post-development hydrologic calculations in accordance with Article VI of the Stormwater Regulations
- Operations and Maintenance Plan in accordance with Appendix D of the Stormwater Regulations
- Erosion and Sedimentation Control Plan in accordance with Appendix C of the Stormwater Regulations or SWPPP as required by NPDES Construction General Permit
- Construction Schedule including estimated dates for initiation and completion for such tasks as clearing and grubbing, grading, utility installation, construction of buildings, paving and final grading and landscaping
- Copy of Site Plan Approval or a Grading Permit from the Planning Board (if required)
- A sketch plan illustrating:
- Existing features of the site including structures, pavement and landscaped areas
- Proposed areas of land disturbance, stormwater management measures for new impervious areas and limit of work boundary
- Erosion control measures to prevent sediment from entering the MS4 system
- Details of an on-going maintenance program for the stormwater management measures with the name and contact information of the person responsible
Permitting Fee Schedule
Each Stormwater Management Permit application must include the required filing fee. This fee is payable at the time of application and is non-refundable. If you have any questions about the following fee information, reach out at stormwater@braintreema.gov or 781-794-8930
Activity | Application Fee |
---|---|
Existing Building/Drain Connection | No charge |
Land Disturbance more than 2,500 SF but less than 6,000 SF | $100.00 |
New or Redeveloped Single/Two Family House | $250.00 |
Residential Development other than Single Family House | |
Residential Subdivisions | |
2-3 Lots | $300.00 |
4-10 Lots | $1,000.00 |
11+ Lors | $1,500.00 |
Multi-Family Structures | |
Townhouses, condominiums, apartments larger than 2 units | |
3-10 Units | $700.00 |
11-23 Units | $900.00 |
24-40 Units | $2,000.00 |
41+ Units | $2,750.00 |
Commercial and Industrial Projects | |
Disturbance of 2,500 - 5,000 SF | $400.00 |
Disturbance of 5,001 - 21,779 SF | $500.00 |
Disturbance of 21,780 (1/2 Acre) - 1 Acre | $600.00 |
Disturbance of 1.1 - 2 Acres | $700.00 |
Disturbance of 2.1 - 10 Acres | $1,000.00 |
Disturbance of 10+ Acres | $1,500.00 |
Request for Certificate of Completion | |
Single or Two Family House | $100.00 |
All Others | $200.00 |